Cotton Calamaio Homes is in the process of completing the infrastructure project. The roadway is bladed and the main water system is installed. All the dry utilities, electric and phone, are installed and “stubbed out” to each lot. There are water services provided to each lot, as well. The well will be completed by the beginning of November and roadway should be completed by January 2009. Click Here for SITE PLAN
|
|
|
|
|
| No warranty, expressed or implied, is made as to the accuracy of the information contained herein and same is submitted subject to error, omissions, change of price, availability, withdrawal without notice, or other conditions. No liability of any kind is to be imposed on the broker herein. All information herein should be verified by buyers' representatives prior to purchase. |
|
|